This slide series shows the installation of a commercial bank vault
1 / 11 -
The entire installation was performed in a 24-hour period in June 2007
2 / 11 -
Protecting the marble floor with plywood and steel
-
Raising the vault door
-
Lining the vault door up to go through the bank doors
-
Bringing the vault door in with the power pallet jack
-
Welding the panels in place
-
Smog Hog filters fumes and cleans the air
-
The last roof panel being installed
-
Vault door being raised in place
-
Our crews can perform installations globally
-